Finishing Touches

Jul 25, 2013
No Comments Yet
Finishing touches are added to the construction – fireplace mantle, the famous mural, and exterior greenery all come together.

Shingles, bricks and drywall

Jun 5, 2013
No Comments Yet
With nearly 50 days left to completion, construction teams carry on with roofing, drywall and additional brick laying.

Interior construction

May 30, 2013
No Comments Yet
Construction continues with development of the interior walls as drywall and other materials are added.

Bricks and Beams

May 15, 2013
No Comments Yet
Work continues on the framing for the covered porch and interior framing.

Brick and Shingles

Apr 30, 2013
No Comments Yet
As work continues, brink and shingles are added and the framing process begins to wrap up.

First Floor Takes Shape!

Apr 8, 2013
No Comments Yet
The first floor takes shape as crews continue through the start of the rainy season.

Framing the First Floor

Apr 1, 2013
No Comments Yet
Framing for the first floor is starting to go up as hallways and rooms form!

Framing and Rough in for First Floor

Mar 25, 2013
No Comments Yet
Framed wood stairs and landings to 1st floor as well as Basement.

Walls and Floors!

Mar 11, 2013
No Comments Yet
Walls and floors appear as the construction continues. A day or two were lost due to winter weather, but progress continues!

Basement Slab Complete

Feb 26, 2013
No Comments Yet
With the slab complete, excavation and grading continue while several days are lost due to winter weather. A gallery of shots are included.
  • Twitter feed loading...

Warning: Unknown: open(/home/content/85/2311985/tmp/sess_f02squudhvlb21lp0d4th2d7b6, O_RDWR) failed: No such file or directory (2) in Unknown on line 0

Warning: Unknown: Failed to write session data (files). Please verify that the current setting of session.save_path is correct () in Unknown on line 0